Uncovering Critical Drivers and Structuring a Hierarchical Criterion Framework for Maintenance Integration in Open-Shop Manufacturing Systems: A Hybrid DEMATEL–ROV Decision Model
Main Article Content
Abstract
Production planning and scheduling play a critical role in enhancing operational efficiency within manufacturing facilities. In practical applications, such as scheduling net activities, cleaning operations, production in various industries, and associated auxiliary processes, any delay in task execution inevitably leads to increased resource expenditure. This phenomenon, widely recognized in the literature, is often described as the time-dependent degradation effect. Consequently, integrating maintenance and repair strategies into production planning, particularly within open-shop manufacturing systems, is of paramount importance. Motivated by the lack of research systematically identifying factors affecting the integration of maintenance and production activities, the present study investigates this issue within an open-shop production context. A hybrid multi-criteria decision-making approach, combining the DEMATEL method with a novel Ordered Priority Approach (OPA), is employed. DEMATEL is utilized to screen the collected criteria and uncover causal relationships among them, while OPA is applied for systematic ranking. The results indicate that, after DEMATEL-based screening, ten critical criteria are identified. According to the OPA analysis, availability of tools, materials, spare parts, and equipment, production operating costs, and maintenance and repair expenses are ranked as the top three factors in terms of significance.